Details
- TitlePlans of well and water supply; Overhaul programme and servicing; North condenser; and holding lugs
- ReferenceUK0108 NAEST 001/2/672
- Date1921-1959
- Scope and ContentPlans of proposed well and water pipes, connecting tubes etc. General Plan, Overhaul programme, Graph of unit running load; details of rear wall tubes and side wall tube holding lugs; timetable of servicing required for No. 22 boiler and time allocated for each task; North condenser, looking at East face.
- Physical descriptionNumber of pieces: 12
- LanguageEnglish
- Subject
- Conditions governing accessUnlimited
- Level of descriptionfile
Hierarchy browser