- TitleInitial Report by the Standing Regional Working Party ... on Switchgear defects on 6.6 KV Auxiliary Circuits...
- ReferenceUK0108 NAEST 001/1/175
- Date1962-07
- Scope and ContentInitial Report by the Standing Regional Working Party (Defects and Operational Difficulties): Switchgear Defects on 6.6 KV Auxiliary Circuits. Aberthaw Power Station
- Physical descriptionNumber of pieces: 1