Details
- TitleOfficial STC photographs of the installation of the trans-Andean cable circa 1930
- ReferenceUK0108 SC MSS 273/01/01
- Date1930 to 1931
- Creator
- Scope and Content4 official STC photographs (copies of originals) of the installation of the trans-Andean cable circa 1930. The photographs are; 1. Photograph E.5778. Caption, 'typical mountain terrain showing the difficult conditions that had to be faced when the STC trans-Andean Cable was laid in the early '30's'. (3 copies). 2. Photograph BH/2182/H. Caption, 'typical mountain terrain showing the difficult conditions that had to be faced when the STC trans-Andean Cable was laid in the early '30's'. [Digital versions available]
- Exent4 Photographs
- Admin. history/BiographyJohn Kemp (1896-1991), who was born in Switzerland, joined Western Electric in 1921 which became Standard Telephones & Cables (STC). He rose to the position of Chief Cable Engineer and travelled extensively with the company until 1939. John Kemp continued to work for STC after WWII up until his retirement from STC in the 1950s. He wrote many technical papers for Standard Telecommunication Laboratories Ltd (STL), which was the central research laboratory for STC, and also wrote several journal articles. John Kemp joined the IEE as a Graduate member in 1924, became an Associate Member in 1926 and then a Member in 1935.
- Persons keyword
- Subject
- Level of descriptionfile
Hierarchy browser