Axiell Internet Server 6
  • Title
    The trans-Andean telephone cable between Chile and Argentina
  • Reference
    UK0108 SC MSS 273/01
  • Date
    1931 to 1963
  • Creator
    John (MIEE) Kemp
  • Scope and Content
    Photographs and papers related to the trans-Andean telephone cable between Santiago in Chile and Buenos Aires in Argentina, the world's highest telephone cable, installed circa 1930. The cable was made at the North Woolwich factory of STC. All the items in SC MSS 273/1 were originally in the same unmarked folder (no longer present).
  • Exent
    1 Folder
  • Admin. history/Biography
    John Kemp (1896-1991), who was born in Switzerland, joined Western Electric in 1921 which became Standard Telephones & Cables (STC). He rose to the position of Chief Cable Engineer and travelled extensively with the company until 1939. John Kemp continued to work for STC after WWII up until his retirement from STC in the 1950s. He wrote many technical papers for Standard Telecommunication Laboratories Ltd (STL), which was the central research laboratory for STC, and also wrote several journal articles. John Kemp joined the IEE as a Graduate member in 1924, became an Associate Member in 1926 and then a Member in 1935.
  • Persons keyword
    Standard Telephones and Cables
  • Level of description
    file
Hierarchy browser
  •  
    110000003

    Special Collection Manuscripts

    contains 322 parts
    •  
      UK0108 SC MSS 273

      John Kemp STC papers

      contains 7 parts
      •  
        UK0108 SC MSS 273/01

        The trans-Andean telephone cable between Chile and Argentina

        contains 5 parts